Job posting has expired
Remote New
Remote, Contractor - Master Project Scheduler EVM
Redwire Space | |
United States | |
Apr 08, 2026 | |
|
Through continuous innovation and operational excellence our team in Littleton, CO are using their engineering talents to design and deploy Power Distribution, Embedded Monitoring and Control, Power Conversion, lighting, and Camera based solutions. These cutting-edge capabilities are helping to revolutionize spaceflight. With many more exciting projects on the horizon, our team could use your curiosity, passion, talent and experience to help us Build Above.
Summary
Redwire Space Missions, LLC is seeking a highly skilled
Remote, Contractor -
Master Project Scheduler to support complex
space vehicle development programs for approximately 3 months, with the possibility of extension. This role is central to building, integrating, and maintaining program schedules that align with
MILSTD881 Work Breakdown Structures (WBS) and the rigorous demands of spacecraft design, integration, test, and launch operations.
The ideal candidate brings deep experience in aerospace or defense programs, thrives in fastmoving technical environments, and can translate engineering inputs into a coherent, fully integrated schedule that drives program execution.
Responsibilities
Ideal Experience
Desired Skills
Redwire is an Equal Opportunity Employer; employment with Redwire is governed on the basis of merit, competence and qualifications and will not be influenced in any manner by race, color, religion, gender, national origin/ethnicity, veteran status, disability status, age, sexual orientation, gender identity, marital status, mental or physical disability or any other legally protected status.
All offers of employment at Redwire are contingent upon clear results of a thorough background check and your ability to provide proof of eligibility to work in the US. Note that some positions will also require US citizenship or ability to obtain a security clearance due to requirements of a classified program.
To conform to U.S. Government space technology export regulations, including the International Traffic in Arms Regulations (ITAR) you must be a U.S. citizen, lawful permanent resident of the U.S., protected individual as defined by 8 U.S.C. 1324b(a)(3), or eligible to obtain the required authorizations from the U.S. Department of State. Learn more about the ITAR Click Here | |
Apr 08, 2026