We use cookies. Find out more about it here. By continuing to browse this site you are agreeing to our use of cookies.
#alert
Back to search results

Project Scheduler III

Blue Origin
life insurance, parental leave, paid time off, paid holidays, 401(k), stock options
United States, Florida, Merritt Island
8082 Space Commerce Way (Show on map)
Nov 18, 2026

Application close date:

Applications will be accepted on an ongoing basis until the requisition is closed.

At Blue Origin, we envision millions of people living and working in space for the benefit of Earth. We're working to develop reusable, safe, and low-cost space vehicles and systems within a culture of safety, collaboration, and inclusion. Join our team of problem solvers as we add new chapters to the history of spaceflight!

This role is part of Blue Origin corporate functions, providing centralized support across Blue Origin business unit teams, functions, and locations.

As part of a small, passionate, and accomplished team of experts, you will push the boundaries of what's possible in project management, as a visionary and hands-on leader, supporting Blue Origin's Central Florida Facility. You will contribute substantively to the team's impact on all aspects of building our infrastructure and world class facilities.

Responsibilities

Design Phase

  • Plan backward from required completion and operational need dates, establishing enabling milestones (dry-in, permanent power, environmental control, equipment readiness) at kickoff
  • Build and maintain a Level 2 Executive Schedule that communicates the project strategy, key client decisions, and turnover commitments in minutes
  • Develop a Level 3 Integrated Project Schedule linking design, procurement, construction, and commissioning logic, with every critical activity having a clear owner and tie to project need
  • Create Design Work Packages tied to downstream procurement and construction need dates, replacing generic percentage-based releases
  • Maintain the Milestone Register, ensuring every milestone has an owner and documented slip impact
  • Maintain the Schedule Assumptions Log, validating assumptions or converting them to risks before they drive the schedule
  • Lead critical and near-critical path reviews of logic (not just software output), identifying ways to protect or shorten the path
  • Plan and control early release strategy for long-lead and enabling packages (civil/site, foundations, structural steel, major equipment, utilities, permits)

Construction Phase

  • Develop, submit, and maintain the contract-compliant baseline CPM schedule, integrating trade and vendor schedules
  • Issue monthly schedule updates with narrative covering critical path, float trends, forecast completion, and top risks
  • Produce 3-week look-aheads and lead weekly constraint reviews with the field
  • Track procurement and submittals against on-site need dates, escalating long-lead risks early
  • Prepare fragnets and Time Impact Analyses for changes, RFIs, and delays; support change order and claims documentation
  • Develop recovery schedules and mitigation options when the critical path slips
  • Sequence commissioning, testing, training, punch list, and turnover activities through occupancy
  • Run recurring schedule quality/health checks and correct issues before issuing updates
  • Reconcile schedule progress with field-verified quantities and support earned value/S-curve reporting

Leadership & Interfaces

  • Act as a leadership-facing project controls partner - challenging logic, assumptions, and release timing, not just operating software
  • Interface regularly with the Project Director/PM, design leads, preconstruction/procurement, superintendents and trade partners, owner/client, and commissioning teams
  • Use AI-assisted review to support (not replace) scheduling judgment - e.g., CPM logic checks, milestone validation, float analysis, and risk identification
Qualifications
  • Bachelor's degree in Construction Management, Engineering, Architecture, or related field - or equivalent experience
  • 7+ years of CPM scheduling experience on commercial, industrial, or mission-critical projects, spanning both design and construction phases
  • Advanced proficiency in Oracle Primavera P6; working knowledge of Microsoft Project
  • Experience developing baselines, monthly updates, fragnets, and Time Impact Analyses
  • Working understanding of design deliverables, procurement/submittal cycles, construction sequencing, and commissioning
  • Strong written and verbal communication skills; able to present schedule status and risk to executives
Desired
  • AACE Planning & Scheduling Professional (PSP) or PMI Scheduling Professional (PMI-SP) certification
  • Design-build or integrated services delivery experience
  • Delay analysis / forensic scheduling and claims support experience
  • Experience with schedule analytics tools (e.g., Acumen Fuse, Schedule Analyzer) and AI-assisted review
  • Experience on aerospace, industrial, or mission-critical facilities

Culture Statement

Don't meet all desired requirements? Studies have shown that some people are less likely to apply to jobs unless they meet every single desired qualification. At Blue Origin, we are dedicated to building an authentic workplace, so if you're excited about this role but your past experience doesn't align perfectly with every desired qualification in the job description, we encourage you to apply anyway. You may be just the right candidate for this or other roles.

Export Control Regulations

Applicants for employment at Blue Origin must be a U.S. citizen or national, U.S. permanent resident (i.e. current Green Card holder), or lawfully admitted into the U.S.as a refugee or granted asylum.

Background Check

  • Required for all positions: Blue's Standard Background Check
  • Required for Certain Job Profiles: Defense Biometric Identification System (DBIDS) background check if at any time the role requires one to be on a military installation
  • Required for Certain Job Profiles: Drivers who operate Commercial Motor Vehicles with a Gross Vehicle Weight (GVW), Gross Vehicle Weight Rating (GVWR) or combination of power unit and trailer that meets or exceeds 10,001 lbs. and/or transports placardable amounts of hazardous materials by ground in any vehicle on a public road while in commerce, may be subject to additional Federal Motor Carrier Safety Regulations including: Driver Qualification Files, Medical Certification (obtained before onboarding), Road Test, Hours of Service, Drug and Alcohol Testing, vehicle inspection requirements, CDL requirements (if applicable) and hazardous materials transportation/shipping training.
  • Required for certain Job Profiles: Ability to obtain and maintain Merchant Mariner Credential, which includes pre-employment and random drug testing as well as DOT physical

Benefits

  • Benefits include: Medical, dental, vision, basic and supplemental life insurance, paid parental leave, short and long-term disability, 401(k) with a company match of up to 5%, and an Education Support Program.
  • Stock Options for all regular employees (working at least 20 hours/week)
  • Paid Time Off: Up to four (4) weeks per year based on weekly scheduled hours, and up to 14 company-paid holidays.
  • Dependent on role type and job level, employees may be eligible for benefits and bonuses based on the company's intent to reward individual contributions and enable them to share in the company's results, or other factors at the company's sole discretion. Bonus amounts and eligibility are not guaranteed and subject to change and cancellation. Please check with your recruiter for more details.

Equal Employment Opportunity

Blue Origin is proud to be an Equal Opportunity/Affirmative Action Employer and is committed to attracting, retaining, and developing a highly qualified and dedicated work force. Blue Origin hires and promotes people on the basis of their qualifications, performance, and abilities. We support the establishment and maintenance of a workplace that fosters trust, equality, and teamwork. We provide all qualified applicants for employment and employees with equal opportunities for hire, promotion, and other terms and conditions of employment, regardless of their race, color, religion, sex, sexual orientation, gender identity, national origin/ethnicity, age, physical or mental disability, genetic factors, military/veteran status, or any other status or characteristic protected by federal, state, and/or local law. Blue Origin will consider for employment qualified applicants with criminal histories in a manner consistent with applicable federal, state, and local laws, including the Washington Fair Chance Act, the California Fair Chance Act, the Los Angeles Fair Chance in Hiring Ordinance, and other applicable laws. For more information on "Know Your Rights," please see here.

Affirmative Action and Disability Accommodation

Applicants wishing to receive information on Blue Origin's Affirmative Action Plans, or applicants requiring a reasonable accommodation in order to participate in the application and/or interview process, please contact us atEEOCompliance@blueorigin.com. Please note this is a publicly managed inbox. Please do not include any personal medical information in your request.

Applied = 0

(web-76b8bdc8d5-74bzw)